The Prom Apartment Earthworks
Allday Construction is currently completing the earthworks for a multi-story apartment block located in McLarty Ave, Joondalup for Perth Builder, PSAROS.
The Prom Apartments scope of work includes:
All rubbish, vegetation and top soil removed from the entire block
The site cut then levelled and compacted in accordance with site plan specifications
Footings dug and all excess spoil removed
Back filling and compaction performed in layers of no more than 300mm
Final trim in preparation for concrete and post compacted to a minimum of 8 blows and certified with compaction certificate provided
Soft landscaped areas boxed out as required